Lonnie Hedgepeth of Rocky Mount,
North Carolina has used the plans
on my page of Covered
Bridge Plans and is building a Covered bridge for his live steam train.
The following pictures shows the
construction up to July 17 2003.
These pictures will be updated
as the project continues.
You can see that a great deal of
detail is going into this bridge.
Specifications
| TYPE: HOWE TRUSS RAILROAD BRIDGE
SPAN: 32 FEET WIDTH: 68 INCHES INSIDE VERTICAL CLEARANCE: 64 INCHES MATERIAL: PRESSURE TREATED SOUTHERN YELLOW PINE TOP CHORD: 3 BEAMS 4-INCHES BY 6-INCHES BOTTOM CHORD: 3 BEAMS 4-INCHES BY 6-INCHES LATERAL SUPPORT TIE RODS: ½ INCH DIAMETER STEEL VERTICAL TRUSS RODS: ¾ INCH DIAMETER STEEL BOLTS: TOP AND BOTTOM CHORDS, ½ INCH BY 12 INCHES AND ½ INCH BY 14 INCHES GALVANIZED. TRUSS ROD SUPPORT PLATES: ½ INCH STEEL PLATE 3-INCHES BY 10-INCHES BULKHEADS: 6-INCH BY 6-INCH TREATED PINE SET ON CONCRETE FOOTINGS ANCHORED WITH ¾ INCH THREADED RODS |
If any one would like to contact Lonnie Hedgepeth directly click here.